00
Intake
Confirm what Buildability is allowed to assess — the accepted Design wireframes + Specify contracts (data model, NFRs, op catalog, DPIA stub, integrations). Sets the evidence-tier target (D) and the 6 dimensions ahead. The input gate to the assessment.